Assessment Year | 1999 |
---|---|
Principal Product | Winches, Wheel Drives, and Hoists |
NAICS |
n/a
|
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $50 M to 100M |
# of Employees | 60 |
Plant Area |
160,000
ft2
|
Annual Production | 7,000
pieces
|
Production Hrs. Annual | 6,800
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $176,105 | 7,092,614 |
kWh
|
$0.025 |
Electricity Demand | $14,747 | - |
|
- |
Natural Gas | $71,347 | 20,311 |
MMBtu
|
$3.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $45,334 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,161 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,582 | $16,945 |
$5,582
135,991
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,215 | $45,737 |
$15,215
279,601
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,266 | $1,900 |
$3,266
109,320
kWh
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $545 | $246 |
$545
14,068
kWh
|
- | - | |
05 | 3.5311: Recover and reuse waste material | $13,831 | $8,000 | - |
$13,831
-
lb
|
- | |
06 | 2.4322: Use or replace with energy efficient substitutes | $6,895 | $34,750 | - | - | $6,895 | |
TOTAL RECOMMENDED | $45,334 | $107,578 |
$24,608
538,980
kWh
|
$13,831
-
lb
|
$6,895 | ||
TOTAL IMPLEMENTED | $10,161 | $36,650 |
$3,266
109,320
kWh
|
- | $6,895 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs