ITAC Assessment: OK0570
ITAC logo
ITAC Assessment: OK0570
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Transformers
NAICS
n/a
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 80,000
ft2
Annual Production 72
pieces
Production Hrs. Annual 3,840
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,584 1,179,660
kWh
Electricity Demand $49,130 -
Electricity Fees $1,098 -
Natural Gas $21,429 8,745
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,502 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.7135: Install occupancy sensors $726 $2,286 n/a $726
24,326
kWh
- - - - -
02 4.821: Pay bills on time to avoid late fees $333 - n/a - - - - - $333
03 4.424: Improve space comfort conditioning $40,159 $2,880 n/a - - - - $40,159 -
04 3.1175: Use a different or recycled raw material $12,000 $17,070 n/a - - $12,000
-
gal
- - -
05 2.1116: Improve combustion control capability $665 - n/a - $665
-
MMBtu
- - - -
06 3.5313: Increase amount of waste recovered for resale $400 - n/a - - - $400
-
lb
- -
07 2.4221: Install compressor air intakes in coolest locations $519 $150 n/a $519
9,379
kWh
- - - - -
08 3.5311: Recover and reuse waste material $2,700 - n/a - - - $2,700
-
lb
- -
TOTAL RECOMMENDED $57,502 $22,386 $1,245
33,705
kWh
$665
-
MMBtu
$12,000
-
gal
$3,100
-
lb
$40,159 $333
TOTAL IMPLEMENTED - - - - - - - -