ITAC Assessment: OK0568
ITAC logo
ITAC Assessment: OK0568
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Pressure vessels
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 25,000
ft2
Annual Production 120
pieces
Production Hrs. Annual 6,084
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,633 658,558
kWh
Natural Gas $18,205 4,203
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,928 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,760

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.7135: Install occupancy sensors $233 $731 $233
8,499
kWh
- - - - -
02 2.3212: Optimize plant power factor $2,682 $2,748 - $2,682
-
kW-mo/yr
- - - -
03 2.8114: Change rate schedules or other changes in utility service $2,224 - - - - - - $2,224
04 4.424: Improve space comfort conditioning $45,160 $4,700 - - - - $45,160 -
05 2.6232: Install set-back timers $6,869 $1,300 - - $6,869
-
MMBtu
- - -
06 3.4111: Use closed cycle process to minimize waste water production $2,760 $35,247 - - - $2,760
-
gal
- -
TOTAL RECOMMENDED $59,928 $44,726 $233
8,499
kWh
$2,682
-
kW-mo/yr
$6,869
-
MMBtu
$2,760
-
gal
$45,160 $2,224
TOTAL IMPLEMENTED $2,760 $35,247 - - - $2,760
-
gal
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs