ITAC Assessment: OK0564
ITAC logo
ITAC Assessment: OK0564
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Disposable Breathing Bags
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 80
Plant Area 35,000
ft2
Annual Production 15,000,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,155 1,125,440
kWh
Electricity Demand $21,359 3,389
kW-mo/yr
Electricity Fees $1,928 -
Natural Gas $65,683 20,394
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $315,911 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $313,020

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.2511: Insulate bare equipment $689 $701 - - $689
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,775 $3,500 - - $1,775
-
MMBtu
-
03 2.4221: Install compressor air intakes in coolest locations $427 $417 $292
9,379
kWh
$135
-
kW-mo/yr
- -
04 4.125: $313,020 $325,000 - - - $313,020
-
lb
TOTAL RECOMMENDED $315,911 $329,618 $292
9,379
kWh
$135
-
kW-mo/yr
$2,464
-
MMBtu
$313,020
-
lb
TOTAL IMPLEMENTED $313,020 $325,000 - - - $313,020
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs