Assessment Year | 1999 |
---|---|
Principal Product | Blow molded equipment |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
185,000
ft2
|
Annual Production | 18,000,000
lb
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $262,695 | 11,125,440 |
kWh
|
$0.024 |
Electricity Demand | $172,163 | - |
|
- |
Electricity Fees | $(-21,982.0) | - |
|
- |
Natural Gas | $35,967 | 6,818 |
MMBtu
|
$5.28 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $152,281 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $136,861 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.444: Install system to collect scrap | $68,913 | $7,650 |
$648
30,875
kWh
|
- | - | - | - | $68,265 | |
02 | 2.8121: Apply for tax-free status for energy purchases | $29,064 | - | - | - | $29,064 | - | - | - | |
03 | 2.4322: Use or replace with energy efficient substitutes | $15,420 | $68,000 | - | - | - |
$15,420
-
MMBtu
|
- | - | |
04 | 2.2511: Insulate bare equipment | $14,128 | $11,350 |
$14,128
605,510
kWh
|
- | - | - | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $11,432 | $4,500 |
$7,122
339,097
kWh
|
$4,310
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,164 | $320 |
$3,179
156,213
kWh
|
$1,985
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.7145: Install skylights | $4,523 | $5,340 |
$2,818
134,232
kWh
|
$1,705
-
kW-mo/yr
|
- | - | - | - | |
08 | 3.5313: Increase amount of waste recovered for resale | $3,637 | $7,900 | - | - | - | - |
$3,637
-
lb
|
- | |
TOTAL RECOMMENDED | $152,281 | $105,060 |
$27,895
1,265,927
kWh
|
$8,000
-
kW-mo/yr
|
$29,064 |
$15,420
-
MMBtu
|
$3,637
-
lb
|
$68,265 | ||
TOTAL IMPLEMENTED | $136,861 | $37,060 |
$27,895
1,265,927
kWh
|
$8,000
-
kW-mo/yr
|
$29,064 | - |
$3,637
-
lb
|
$68,265 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs