Assessment Year | 2014 |
---|---|
Principal Product | Polystyrene |
NAICS | 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing |
SIC | 3086: Plastics Foam Products |
Sales Range | $10 M to 50M |
# of Employees | 25 |
Plant Area |
55,000
ft2
|
Annual Production | 5,292,000
lb
|
Production Hrs. Annual | 3,640
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $66,840 | 1,000,800 |
kWh
|
$0.067 |
Electricity Demand | $30,297 | 2,979 |
kW-mo/yr
|
$10.17 |
Electricity Fees | $4,597 | - |
|
- |
Natural Gas | $195,546 | 27,142 |
MMBtu
|
$7.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,491 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,045 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1213: Direct warmest air to combustion intake | $2,000 | $3,250 | - | - |
$2,000
-
MMBtu
|
|
02 | 2.2136: Install / repair insulation on steam lines | $6,697 | $5,463 | - | - |
$6,697
-
MMBtu
|
|
03 | 2.3212: Optimize plant power factor | $1,749 | $4,000 | - |
$1,749
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,283 | $3,073 |
$856
12,776
kWh
|
$427
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,714 | $28,054 |
$5,151
76,877
kWh
|
$2,563
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $48 | $138 |
$32
473
kWh
|
$16
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $19,491 | $43,978 |
$6,039
90,126
kWh
|
$4,755
-
kW-mo/yr
|
$8,697
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,045 | $31,265 |
$6,039
90,126
kWh
|
$3,006
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs