Assessment Year | 1999 |
---|---|
Principal Product | carbonated beverages |
NAICS |
n/a
|
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $50 M to 100M |
# of Employees | 115 |
Plant Area |
216,000
ft2
|
Annual Production | 36,000,000
pieces
|
Production Hrs. Annual | 4,964
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $407,016 | 7,369,578 |
kWh
|
$0.055 |
Electricity Demand | $92,379 | 17,759 |
kW-mo/yr
|
$5.20 |
Natural Gas | $161,592 | 40,840 |
MMBtu
|
$3.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $158,630 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $147,970 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2211: Use optimum temperature | $25,150 | $9,360 | - | - |
$25,150
-
MMBtu
|
- | - | - | |
02 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $4,760 | $13,490 | - | - |
$4,760
-
MMBtu
|
- | - | - | |
03 | 2.7291: Reschedule and rearrange multiple-source heating systems | $2,250 | $280 | - | - |
$2,250
-
MMBtu
|
- | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,950 | $3,040 |
$1,070
35,463
kWh
|
$880
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.2437: Recover waste heat from equipment | $1,300 | $1,960 | - | - |
$1,300
-
MMBtu
|
- | - | - | |
06 | 2.2511: Insulate bare equipment | $1,120 | $860 | - |
$500
-
kW-mo/yr
|
$620
-
MMBtu
|
- | - | - | |
07 | 3.4151: Minimize water usage | $12,240 | $22,300 | - | - | - |
$12,240
-
Tgal
|
- | - | |
08 | 3.5217: Reuse / recycle/ sell paper products | $2,650 | $480 | - | - | - | - |
$2,650
-
lb
|
- | |
09 | 3.4154: Eliminate leaks in water lines and valves | $490 | $260 | - | - | - |
$490
-
Tgal
|
- | - | |
10 | 4.111: Add equipment/ operators to reduce production bottleneck | $106,720 | $288,000 | - | - | - | - | - | $106,720 | |
TOTAL RECOMMENDED | $158,630 | $340,030 |
$1,070
35,463
kWh
|
$1,380
-
kW-mo/yr
|
$34,080
-
MMBtu
|
$12,730
-
Tgal
|
$2,650
-
lb
|
$106,720 | ||
TOTAL IMPLEMENTED | $147,970 | $321,060 | - |
$500
-
kW-mo/yr
|
$28,020
-
MMBtu
|
$12,730
-
Tgal
|
- | $106,720 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs