ITAC Assessment: OK0548
ITAC logo
ITAC Assessment: OK0548
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Livestock Feeds
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 80,000
ft2
Annual Production 130,000
ton
Production Hrs. Annual 5,200
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,089 3,472,743
kWh
Electricity Demand $98,441 -
Electricity Fees $6,064 -
Natural Gas $47,109 11,258
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,457 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,124

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,871 $1,728 $1,654
60,961
kWh
$1,217
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,968 $1,477 $780
28,722
kWh
$574
-
kW-mo/yr
- - - $614
03 2.6232: Install set-back timers $1,164 $146 - - $1,164
-
MMBtu
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,020 $400 $1,020
37,515
kWh
- - - - -
05 2.7135: Install occupancy sensors $1,104 $1,566 $1,104
37,808
kWh
- - - - -
06 4.652: Replace existing equipment with more suitable substitutes $34,130 $12,800 - - - - $8,130 $26,000
07 3.5315: Lease / purchase baler; sell cardboard to recycler $2,200 $6,000 - - - $2,200
-
lb
- -
TOTAL RECOMMENDED $44,457 $24,117 $4,558
165,006
kWh
$1,791
-
kW-mo/yr
$1,164
-
MMBtu
$2,200
-
lb
$8,130 $26,614
TOTAL IMPLEMENTED $2,124 $1,966 $2,124
75,323
kWh
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs