Assessment Year | 1998 |
---|---|
Principal Product | Pumps, compressors, valves |
NAICS |
n/a
|
SIC | 3563: Air and Gas Compressors |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
42,000
ft2
|
Annual Production | 17,500
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $48,393 | 1,785,756 |
kWh
|
$0.027 |
Electricity Demand | $107,683 | 10,833 |
kW-mo/yr
|
$9.94 |
Natural Gas | $12,151 | 2,888 |
MMBtu
|
$4.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $66,892 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $63,262 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,363 | $5,833 |
$2,146
79,132
kWh
|
$1,217
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,554 | $1,917 |
$1,006
35,756
kWh
|
$548
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $894 | - |
$894
42,790
kWh
|
- | - | - | |
04 | 2.7135: Install occupancy sensors | $759 | $516 |
$759
28,136
kWh
|
- | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $443 | $99 |
$369
13,482
kWh
|
$74
-
kW-mo/yr
|
- | - | |
06 | 4.513: Re-arrange equipment layout to reduce labor costs | $48,000 | $15,312 | - | - | - | $48,000 | |
07 | 3.5316: Contract a wood pallet recycling company | $10,080 | - | - | - |
$10,080
-
lb
|
- | |
08 | 3.4155: Meter waste water | $1,317 | - | - | - | - | $1,317 | |
09 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $352 | - | - | - |
$352
-
lb
|
- | |
10 | 3.6192: Use a less expensive method of waste removal | $130 | - | - | - |
$130
-
lb
|
- | |
TOTAL RECOMMENDED | $66,892 | $23,677 |
$5,174
199,296
kWh
|
$1,839
-
kW-mo/yr
|
$10,562
-
lb
|
$49,317 | ||
TOTAL IMPLEMENTED | $63,262 | $21,244 |
$3,409
135,404
kWh
|
$1,291
-
kW-mo/yr
|
$10,562
-
lb
|
$48,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs