| Assessment Year | 1997 |
|---|---|
| Principal Product | Sand castings |
| NAICS |
n/a
|
| SIC | 3325: Steel Foundries, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
250,000
ft2
|
| Annual Production | 220
ton
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $275,984 | 11,016,120 |
kWh
|
$0.025 |
| Electricity Demand | $220,167 | - |
|
- |
| Electricity Fees | $1,730 | - |
|
- |
| Natural Gas | $190,960 | 71,593 |
MMBtu
|
$2.67 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $340,265 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,653 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 3.5221: Recycle casting sand | $290,422 | $282,500 |
$(-4,010.0)
(-74,736)
kWh
|
$(-14,332.0)
-
MMBtu
|
$308,764
-
lb
|
- | |
| 02 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $9,080 | $1,260 | - |
$9,080
-
MMBtu
|
- | - | |
| 03 | 2.6242: Minimize operation of equipment maintained in standby condition | $5,369 | $6,768 | - |
$5,369
-
MMBtu
|
- | - | |
| 04 | 2.6232: Install set-back timers | $3,150 | $630 |
$3,150
109,906
kWh
|
- | - | - | |
| 05 | 2.2442: Preheat combustion air with waste heat | $2,850 | $4,477 |
$(-92.0)
(-3,224)
kWh
|
$2,942
-
MMBtu
|
- | - | |
| 06 | 2.1116: Improve combustion control capability | $1,033 | $2,805 | - |
$1,033
-
MMBtu
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $147 | $278 |
$65
1,758
kWh
|
- | - | $82 | |
| 08 | 2.7135: Install occupancy sensors | $134 | $116 |
$134
4,689
kWh
|
- | - | - | |
| 09 | 3.1191: Change procedures / equipment / operating conditions | $28,080 | $2,090 | - | - | - | $28,080 | |
| TOTAL RECOMMENDED | $340,265 | $300,924 |
$(-753.0)
38,393
kWh
|
$4,092
-
MMBtu
|
$308,764
-
lb
|
$28,162 | ||
| TOTAL IMPLEMENTED | $8,653 | $7,514 |
$3,284
114,595
kWh
|
$5,369
-
MMBtu
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||