Assessment Year | 1997 |
---|---|
Principal Product | Sand castings |
NAICS |
n/a
|
SIC | 3325: Steel Foundries, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
250,000
ft2
|
Annual Production | 220
ton
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $275,984 | 11,016,120 |
kWh
|
$0.025 |
Electricity Demand | $220,167 | - |
|
- |
Electricity Fees | $1,730 | - |
|
- |
Natural Gas | $190,960 | 71,593 |
MMBtu
|
$2.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $340,265 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,653 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.5221: Recycle casting sand | $290,422 | $282,500 |
$(-4,010.0)
(-74,736)
kWh
|
$(-14,332.0)
-
MMBtu
|
$308,764
-
lb
|
- | |
02 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $9,080 | $1,260 | - |
$9,080
-
MMBtu
|
- | - | |
03 | 2.6242: Minimize operation of equipment maintained in standby condition | $5,369 | $6,768 | - |
$5,369
-
MMBtu
|
- | - | |
04 | 2.6232: Install set-back timers | $3,150 | $630 |
$3,150
109,906
kWh
|
- | - | - | |
05 | 2.2442: Preheat combustion air with waste heat | $2,850 | $4,477 |
$(-92.0)
(-3,224)
kWh
|
$2,942
-
MMBtu
|
- | - | |
06 | 2.1116: Improve combustion control capability | $1,033 | $2,805 | - |
$1,033
-
MMBtu
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $147 | $278 |
$65
1,758
kWh
|
- | - | $82 | |
08 | 2.7135: Install occupancy sensors | $134 | $116 |
$134
4,689
kWh
|
- | - | - | |
09 | 3.1191: Change procedures / equipment / operating conditions | $28,080 | $2,090 | - | - | - | $28,080 | |
TOTAL RECOMMENDED | $340,265 | $300,924 |
$(-753.0)
38,393
kWh
|
$4,092
-
MMBtu
|
$308,764
-
lb
|
$28,162 | ||
TOTAL IMPLEMENTED | $8,653 | $7,514 |
$3,284
114,595
kWh
|
$5,369
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs