ITAC Assessment: BD0330
ITAC logo
ITAC Assessment: BD0330
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Steel Containers
NAICS 332439: Other Metal Container Manufacturing
SIC 3412: Metal Shipping Barrels, Drums, Kegs, and Pails
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 150,000
ft2
Annual Production 6,800,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,855 1,702,514
kWh
Natural Gas $584,640 33,411
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $407,569 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $321,330

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,133 $5,400 $6,132
105,173
kWh
$1
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,225 $8,850 $3,119
53,500
kWh
$1
-
kW-mo/yr
- - $74 $31
03 2.7135: Install occupancy sensors $1,189 $2,100 $1,188
20,373
kWh
$1
-
kW-mo/yr
- - - -
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $2,578 - $1,066
18,293
kWh
$1
-
kW-mo/yr
- - $312 $1,199
05 2.7142: Utilize higher efficiency lamps and/or ballasts $160 $126 $67
1,152
kWh
$1
-
kW-mo/yr
- - $11 $81
06 2.2437: Recover waste heat from equipment $1,117 - $86
1,476
kWh
$1
-
kW-mo/yr
$1,030
-
MMBtu
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,489 $501 $2,488
42,675
kWh
$1
-
kW-mo/yr
- - - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $442 $2 $441
7,560
kWh
$1
-
kW-mo/yr
- - - -
09 2.4221: Install compressor air intakes in coolest locations $621 - $620
10,638
kWh
$1
-
kW-mo/yr
- - - -
10 2.7231: Use radiant heater for spot heating $81,923 - - - $81,923
-
MMBtu
- - -
11 3.2123: Convert to high volume low pressure (hvlp) paint guns $307,692 $5,801 - - - $307,692
-
gal
- -
TOTAL RECOMMENDED $407,569 $22,780 $15,207
260,840
kWh
$9
-
kW-mo/yr
$82,953
-
MMBtu
$307,692
-
gal
$397 $1,311
TOTAL IMPLEMENTED $321,330 $22,780 $13,435
230,433
kWh
$6
-
kW-mo/yr
- $307,692
-
gal
$85 $112
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs