ITAC Assessment: OK0521
ITAC logo
ITAC Assessment: OK0521
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product speakers/amplifiers
NAICS
n/a
SIC 3651: Household Audio and Video Equipment
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 250,000
ft2
Annual Production 360,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,276 2,604,045
kWh
Electricity Demand $64,026 7,434
kW-mo/yr
Natural Gas $17,599 4,806
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,467 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings
01 3.2176: Increase use of automation $66,300 $200,000 - - - - $66,300
02 3.8142: Distill contaminated solvents for reuse $5,370 $1,320 - - $(-66.0)
-
MMBtu
$5,436
-
gal
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,798 $9,384 $580
22,860
kWh
$1,218
-
kW-mo/yr
- - -
04 2.1123: Install automatic stack damper $679 $847 - - $679
-
MMBtu
- -
05 2.7135: Install occupancy sensors $220 $622 $220
8,792
kWh
- - - -
06 2.4221: Install compressor air intakes in coolest locations $100 $161 $100
4,103
kWh
- - - -
TOTAL RECOMMENDED $74,467 $212,334 $900
35,755
kWh
$1,218
-
kW-mo/yr
$613
-
MMBtu
$5,436
-
gal
$66,300
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs