ITAC Assessment: OK0520
ITAC logo
ITAC Assessment: OK0520
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Electrical submersible pumps
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 110,000
ft2
Annual Production 1,500
pieces
Production Hrs. Annual 4,940
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,750 2,400,352
kWh
Electricity Demand $70,645 6,954
kW-mo/yr
Electricity Fees $931 -
Natural Gas $22,616 5,585
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,103 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,550

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 3.3125: Use distillation, evaporation to remove contaminants $16,641 $12,000 - - - $16,641
-
gal
- -
02 3.5311: Recover and reuse waste material $10,940 - - - - - $10,940
-
lb
-
03 3.1191: Change procedures / equipment / operating conditions $1,039 $2,200 $(-39.0)
(-1,465)
kWh
- - $1,078
-
gal
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $795 $522 $795
29,308
kWh
- - - - -
05 2.6232: Install set-back timers $657 - - - $657
-
MMBtu
- - -
06 2.7111: Reduce illumination to minimum necessary levels $312 $58 $178
6,448
kWh
$134
-
kW-mo/yr
- - - -
07 2.7135: Install occupancy sensors $192 $396 $192
7,034
kWh
- - - - -
08 4.311: Schedule deliveries according to demand $18,000 - - - - - - $18,000
09 3.6124: Burn waste oil for heat $1,527 $3,990 $(-24.0)
(-879)
kWh
- $301
-
MMBtu
$1,250
-
gal
- -
TOTAL RECOMMENDED $50,103 $19,166 $1,102
40,446
kWh
$134
-
kW-mo/yr
$958
-
MMBtu
$18,969
-
gal
$10,940
-
lb
$18,000
TOTAL IMPLEMENTED $46,550 $12,058 $178
6,448
kWh
$134
-
kW-mo/yr
$657
-
MMBtu
$16,641
-
gal
$10,940
-
lb
$18,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs