Assessment Year | 1997 |
---|---|
Principal Product | Electrical submersible pumps |
NAICS |
n/a
|
SIC | 3561: Pumps and Pumping Equipment |
Sales Range | $100 M to 500M |
# of Employees | 200 |
Plant Area |
110,000
ft2
|
Annual Production | 1,500
pieces
|
Production Hrs. Annual | 4,940
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $47,750 | 2,400,352 |
kWh
|
$0.020 |
Electricity Demand | $70,645 | 6,954 |
kW-mo/yr
|
$10.16 |
Electricity Fees | $931 | - |
|
- |
Natural Gas | $22,616 | 5,585 |
MMBtu
|
$4.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,103 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $46,550 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.3125: Use distillation, evaporation to remove contaminants | $16,641 | $12,000 | - | - | - |
$16,641
-
gal
|
- | - | |
02 | 3.5311: Recover and reuse waste material | $10,940 | - | - | - | - | - |
$10,940
-
lb
|
- | |
03 | 3.1191: Change procedures / equipment / operating conditions | $1,039 | $2,200 |
$(-39.0)
(-1,465)
kWh
|
- | - |
$1,078
-
gal
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $795 | $522 |
$795
29,308
kWh
|
- | - | - | - | - | |
05 | 2.6232: Install set-back timers | $657 | - | - | - |
$657
-
MMBtu
|
- | - | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $312 | $58 |
$178
6,448
kWh
|
$134
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.7135: Install occupancy sensors | $192 | $396 |
$192
7,034
kWh
|
- | - | - | - | - | |
08 | 4.311: Schedule deliveries according to demand | $18,000 | - | - | - | - | - | - | $18,000 | |
09 | 3.6124: Burn waste oil for heat | $1,527 | $3,990 |
$(-24.0)
(-879)
kWh
|
- |
$301
-
MMBtu
|
$1,250
-
gal
|
- | - | |
TOTAL RECOMMENDED | $50,103 | $19,166 |
$1,102
40,446
kWh
|
$134
-
kW-mo/yr
|
$958
-
MMBtu
|
$18,969
-
gal
|
$10,940
-
lb
|
$18,000 | ||
TOTAL IMPLEMENTED | $46,550 | $12,058 |
$178
6,448
kWh
|
$134
-
kW-mo/yr
|
$657
-
MMBtu
|
$16,641
-
gal
|
$10,940
-
lb
|
$18,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs