ITAC Assessment: OK0511
ITAC logo
ITAC Assessment: OK0511
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Weld fittings
NAICS
n/a
SIC 3449: Miscellaneous Structural Metal Work
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 74,000
ft2
Annual Production 6,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,333 2,093,201
kWh
Electricity Demand $43,928 5,393
kW-mo/yr
Electricity Fees $4,062 -
Natural Gas $185,244 78,552
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,357 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,853

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7231: Use radiant heater for spot heating $3,504 $18,090 - - $3,504
-
MMBtu
-
02 2.7261: Install timers and/or thermostats $113 $124 - - $113
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,844 $260 $2,844
97,011
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,173 $797 $716
24,326
kWh
$457
-
kW-mo/yr
- -
05 3.1191: Change procedures / equipment / operating conditions $20,723 $15,008 - - - $20,723
-
Tgal
TOTAL RECOMMENDED $28,357 $34,279 $3,560
121,337
kWh
$457
-
kW-mo/yr
$3,617
-
MMBtu
$20,723
-
Tgal
TOTAL IMPLEMENTED $24,853 $16,189 $3,560
121,337
kWh
$457
-
kW-mo/yr
$113
-
MMBtu
$20,723
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs