ITAC Assessment: OK0508
ITAC logo
ITAC Assessment: OK0508
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Printed matter, advertisements
NAICS
n/a
SIC 2721: Periodicals: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 50,000
ft2
Annual Production 180,000,000
pieces
Production Hrs. Annual 8,688
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,113 1,892,145
kWh
Electricity Fees $2,075 -
Natural Gas $35,847 8,670
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,720 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,157

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7261: Install timers and/or thermostats $1,243 $620 - $1,243
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $587 $100 $587
14,947
kWh
- -
03 2.7135: Install occupancy sensors $66 $945 $66
1,465
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,327 $8,741 $3,327
77,374
kWh
- -
05 2.7144: Install spectral reflectors / delamp $359 $90 $359
8,206
kWh
- -
06 2.7144: Install spectral reflectors / delamp $538 $180 $538
12,603
kWh
- -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $600 - - - $600
-
lb
TOTAL RECOMMENDED $6,720 $10,676 $4,877
114,595
kWh
$1,243
-
MMBtu
$600
-
lb
TOTAL IMPLEMENTED $5,157 $9,461 $3,914
92,321
kWh
$1,243
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs