ITAC Assessment: OK0505
ITAC logo
ITAC Assessment: OK0505
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Animal Feeds
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $1
M
to 5
M
# of Employees 12
Plant Area 25,000
ft2
Annual Production 27,000
ton
Production Hrs. Annual 2,665
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,067 570,340
kWh
Electricity Fees $595 -
Natural Gas $25,931 5,623
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,710 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,837

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $750 $1,182 $750
7,620
kWh
- -
02 2.7261: Install timers and/or thermostats $284 $248 - $284
-
MMBtu
-
03 2.2163: Use minimum steam operating pressure $443 - - $443
-
MMBtu
-
04 2.2136: Install / repair insulation on steam lines $827 $928 - $827
-
MMBtu
-
05 3.5217: Reuse / recycle/ sell paper products $773 - - - $773
-
lb
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,644 $150 $1,644
28,429
kWh
- -
07 2.2511: Insulate bare equipment $129 $103 - $129
-
MMBtu
-
08 2.4133: Use most efficient type of electric motors $371 $740 $371
5,862
kWh
- -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $489 - $489
7,913
kWh
- -
TOTAL RECOMMENDED $5,710 $3,351 $3,254
49,824
kWh
$1,683
-
MMBtu
$773
-
lb
TOTAL IMPLEMENTED $2,837 $1,332 $2,394
36,049
kWh
$443
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs