ITAC Assessment: OK0502
ITAC logo
ITAC Assessment: OK0502
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product 35mm/110mm film & "Color Key" Film
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $100
M
to 500
M
# of Employees 600
Plant Area 900,000
ft2
Annual Production 120,000,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $738,606 20,307,445
kWh
Natural Gas $249,416 127,049
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,965 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,672

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $874 $2,754 $874
19,930
kWh
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,052 $1,843 $1,052
24,033
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,241 $10,815 $4,241
143,611
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $10,133 - - $10,133
-
MMBtu
-
05 2.2163: Use minimum steam operating pressure $3,651 - - $3,651
-
MMBtu
-
06 2.4224: Upgrade controls on compressors $7,290 $2,800 $7,290
247,069
kWh
- -
07 3.1191: Change procedures / equipment / operating conditions $10,724 $3,400 - - $10,724
-
Tgal
TOTAL RECOMMENDED $37,965 $21,612 $13,457
434,643
kWh
$13,784
-
MMBtu
$10,724
-
Tgal
TOTAL IMPLEMENTED $32,672 $8,954 $8,164
266,999
kWh
$13,784
-
MMBtu
$10,724
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs