Assessment Year | 1996 |
---|---|
Principal Product | 35mm/110mm film & "Color Key" Film |
NAICS |
n/a
|
SIC | 3081: Unsupported Plastics Film and Sheet |
Sales Range | $100 M to 500M |
# of Employees | 600 |
Plant Area |
900,000
ft2
|
Annual Production | 120,000,000
thousand feet
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $738,606 | 20,307,445 |
kWh
|
$0.036 |
Natural Gas | $249,416 | 127,049 |
MMBtu
|
$1.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,965 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,672 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $874 | $2,754 |
$874
19,930
kWh
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,052 | $1,843 |
$1,052
24,033
kWh
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,241 | $10,815 |
$4,241
143,611
kWh
|
- | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $10,133 | - | - |
$10,133
-
MMBtu
|
- | |
05 | 2.2163: Use minimum steam operating pressure | $3,651 | - | - |
$3,651
-
MMBtu
|
- | |
06 | 2.4224: Upgrade controls on compressors | $7,290 | $2,800 |
$7,290
247,069
kWh
|
- | - | |
07 | 3.1191: Change procedures / equipment / operating conditions | $10,724 | $3,400 | - | - |
$10,724
-
Tgal
|
|
TOTAL RECOMMENDED | $37,965 | $21,612 |
$13,457
434,643
kWh
|
$13,784
-
MMBtu
|
$10,724
-
Tgal
|
||
TOTAL IMPLEMENTED | $32,672 | $8,954 |
$8,164
266,999
kWh
|
$13,784
-
MMBtu
|
$10,724
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs