ITAC Assessment: OK0483
ITAC logo
ITAC Assessment: OK0483
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Breaded Meat Products
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 100,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $284,791 11,925,557
kWh
Electricity Demand $205,596 2,466
kW-mo/yr
Electricity Fees $42,642 -
Natural Gas $137,803 50,896
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,032 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,972

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $51,060 - - $51,060
-
kW-mo/yr
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $6,400 - - - $6,400
-
MMBtu
-
03 2.6231: Utilize controls to operate equipment only when needed $1,740 $5,400 $1,740
66,823
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $838 $786 $487
18,757
kWh
$351
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $434 $1,779 $287
11,137
kWh
$147
-
kW-mo/yr
- -
06 3.6123: Burn wood by-products for heat $28,560 $29,500 - $(-560.0)
-
kW-mo/yr
- $29,120
-
lb
TOTAL RECOMMENDED $89,032 $37,465 $2,514
96,717
kWh
$50,998
-
kW-mo/yr
$6,400
-
MMBtu
$29,120
-
lb
TOTAL IMPLEMENTED $37,972 $37,465 $2,514
96,717
kWh
$(-62.0)
-
kW-mo/yr
$6,400
-
MMBtu
$29,120
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs