| Assessment Year | 1995 |
|---|---|
| Principal Product | Activated carbon |
| NAICS |
n/a
|
| SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
20,000
ft2
|
| Annual Production | 30,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $430,811 | 14,402,697 |
kWh
|
$0.030 |
| Natural Gas | $768,895 | 293,957 |
MMBtu
|
$2.62 |
| Other Energy | $236,476 | 55,188 |
MMBtu
|
$4.28 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $198,912 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $87,976 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1392: Replace purchased steam with other energy source | $106,541 | $79,290 | - |
$(-129,935.0)
-
MMBtu
|
$236,476
-
MMBtu
|
- | - | |
| 02 | 2.2113: Repair or replace steam traps | $12,864 | $1,140 | - | - |
$12,864
-
MMBtu
|
- | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $10,648 | $37,548 |
$10,648
525,205
kWh
|
- | - | - | - | |
| 04 | 2.6231: Utilize controls to operate equipment only when needed | $4,395 | $1,800 |
$4,395
245,311
kWh
|
- | - | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $66 | $593 |
$66
3,810
kWh
|
- | - | - | - | |
| 06 | 3.5316: Contract a wood pallet recycling company | $48,360 | - | - | - | - | - |
$48,360
-
lb
|
|
| 07 | 2.2121: Increase amount of condensate returned | $16,038 | $18,192 | - | - | - |
$16,038
-
Tgal
|
- | |
| TOTAL RECOMMENDED | $198,912 | $138,563 |
$15,109
774,326
kWh
|
$(-129,935.0)
-
MMBtu
|
$249,340
-
MMBtu
|
$16,038
-
Tgal
|
$48,360
-
lb
|
||
| TOTAL IMPLEMENTED | $87,976 | $57,473 |
$10,714
529,015
kWh
|
- |
$12,864
-
MMBtu
|
$16,038
-
Tgal
|
$48,360
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs