ITAC Assessment: OK0482
ITAC logo
ITAC Assessment: OK0482
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Activated carbon
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 20,000
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $430,811 14,402,697
kWh
Natural Gas $768,895 293,957
MMBtu
Other Energy $236,476 55,188
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $198,912 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $87,976

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.1392: Replace purchased steam with other energy source $106,541 $79,290 - $(-129,935.0)
-
MMBtu
$236,476
-
MMBtu
- -
02 2.2113: Repair or replace steam traps $12,864 $1,140 - - $12,864
-
MMBtu
- -
03 2.4133: Use most efficient type of electric motors $10,648 $37,548 $10,648
525,205
kWh
- - - -
04 2.6231: Utilize controls to operate equipment only when needed $4,395 $1,800 $4,395
245,311
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $66 $593 $66
3,810
kWh
- - - -
06 3.5316: Contract a wood pallet recycling company $48,360 - - - - - $48,360
-
lb
07 2.2121: Increase amount of condensate returned $16,038 $18,192 - - - $16,038
-
Tgal
-
TOTAL RECOMMENDED $198,912 $138,563 $15,109
774,326
kWh
$(-129,935.0)
-
MMBtu
$249,340
-
MMBtu
$16,038
-
Tgal
$48,360
-
lb
TOTAL IMPLEMENTED $87,976 $57,473 $10,714
529,015
kWh
- $12,864
-
MMBtu
$16,038
-
Tgal
$48,360
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs