ITAC Assessment: LT0097
ITAC logo
ITAC Assessment: LT0097
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PROCESSED POULTRY
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 32,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $271,047 5,216,002
kWh
Natural Gas $100,003 25,670
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,628 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,328

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $4,860 - - $5,460
-
MMBtu
$(-600.0)
02 2.2135: Repair and eliminate steam leaks $1,620 $200 - $1,620
-
MMBtu
-
03 2.2136: Install / repair insulation on steam lines $748 $295 - $748
-
MMBtu
-
04 2.2511: Insulate bare equipment $103 $131 - $103
-
MMBtu
-
05 2.4133: Use most efficient type of electric motors $197 $262 $197
4,396
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,100 $670 $3,100
68,288
kWh
- -
TOTAL RECOMMENDED $10,628 $1,558 $3,297
72,684
kWh
$7,931
-
MMBtu
$(-600.0)
TOTAL IMPLEMENTED $10,328 $1,165 $3,100
68,288
kWh
$7,828
-
MMBtu
$(-600.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs