ITAC Assessment: OK0480
ITAC logo
ITAC Assessment: OK0480
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Franks
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $50
M
to 100
M
# of Employees 170
Plant Area 98,400
ft2
Annual Production 0
lb
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $254,153 7,702,228
kWh
Natural Gas $77,156 57,030
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $144,333 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $138,121

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,052 $13,165 $6,052
165,885
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $2,521 - - $2,521
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $400 $1,384 $400
11,723
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $160 $792 $160
4,396
kWh
- -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $135,200 - - - $135,200
-
lb
TOTAL RECOMMENDED $144,333 $15,341 $6,612
182,004
kWh
$2,521
-
MMBtu
$135,200
-
lb
TOTAL IMPLEMENTED $138,121 $1,384 $400
11,723
kWh
$2,521
-
MMBtu
$135,200
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs