Assessment Year | 1995 |
---|---|
Principal Product | Pressure vessels |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
350,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,550
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $84,913 | 2,878,371 |
kWh
|
$0.030 |
Natural Gas | $14,940 | 4,310 |
MMBtu
|
$3.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,853 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,836 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (non-haz) Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $609 | $360 |
$609
20,516
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,051 | $80 |
$2,051
72,978
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,650 | $6,490 |
$1,650
37,515
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,762 | $10,597 |
$1,762
37,515
kWh
|
- | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $764 | $410 |
$764
16,413
kWh
|
- | |
06 | 3.8142: Distill contaminated solvents for reuse | $5,017 | $5,994 | - |
$5,017
-
gal
|
|
TOTAL RECOMMENDED | $11,853 | $23,931 |
$6,836
184,937
kWh
|
$5,017
-
gal
|
||
TOTAL IMPLEMENTED | $6,836 | $17,937 |
$6,836
184,937
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Liquid (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs