ITAC Assessment: OK0469
ITAC logo
ITAC Assessment: OK0469
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Custom printed envelope
NAICS
n/a
SIC 2677: Envelopes
Sales Range $10
M
to 50
M
# of Employees 101
Plant Area 117,500
ft2
Annual Production 750,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,469 2,626,905
kWh
Natural Gas $6,162 1,153
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,571 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,968

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,273 $20,856 $9,273
189,332
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,961 $18,975 $3,961
80,891
kWh
03 2.4221: Install compressor air intakes in coolest locations $642 $1,638 $642
13,189
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $305 $356 $305
2,345
kWh
05 2.7135: Install occupancy sensors $218 $520 $218
4,689
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $172 $102 $172
3,517
kWh
TOTAL RECOMMENDED $14,571 $42,447 $14,571
293,963
kWh
TOTAL IMPLEMENTED $9,968 $21,834 $9,968
199,883
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs