ITAC Assessment: OK0465
ITAC logo
ITAC Assessment: OK0465
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Gas fire turbine related products
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 87,500
ft2
Annual Production 400
pieces
Production Hrs. Annual 5,125
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,939 2,263,482
kWh
Natural Gas $42,478 12,756
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,072 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,332

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4224: Upgrade controls on compressors $11,014 $10,115 $11,014
200,762
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,695 $90 $2,695
87,046
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,707 $6,141 $1,707
43,376
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,033 - $1,033
32,239
kWh
05 2.7134: Use photocell controls $897 $936 $897
28,136
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $726 $870 $726
5,569
kWh
TOTAL RECOMMENDED $18,072 $18,152 $18,072
397,128
kWh
TOTAL IMPLEMENTED $15,332 $12,011 $15,332
321,513
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs