ITAC Assessment: OK0463
ITAC logo
ITAC Assessment: OK0463
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Sausage and ham
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 120,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 4,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $637,388 15,086,460
kWh
Natural Gas $231,590 91,100
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,893 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,780

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $13,078 $23,140 - $13,078
-
MMBtu
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,020 $3,000 $3,020
69,754
kWh
- -
03 2.4224: Upgrade controls on compressors $4,172 $2,500 $4,172
96,131
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $941 $1,315 $941
21,688
kWh
- -
05 2.2136: Install / repair insulation on steam lines $3,357 $1,535 - $3,357
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,526 $19,716 $6,526
182,298
kWh
- -
07 3.3133: Use other waste concentration methods $25,799 $50,000 - - $25,799
-
lb
TOTAL RECOMMENDED $56,893 $101,206 $14,659
369,871
kWh
$16,435
-
MMBtu
$25,799
-
lb
TOTAL IMPLEMENTED $51,780 $97,391 $9,546
252,052
kWh
$16,435
-
MMBtu
$25,799
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs