| Assessment Year | 1995 |
|---|---|
| Principal Product | Sausage and ham |
| NAICS |
n/a
|
| SIC | 2013: Sausages and Other Prepared Meat Products |
| Sales Range | $50 M to 100M |
| # of Employees | 400 |
| Plant Area |
120,000
ft2
|
| Annual Production | 50,000,000
lb
|
| Production Hrs. Annual | 4,600
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $637,388 | 15,086,460 |
kWh
|
$0.042 |
| Natural Gas | $231,590 | 91,100 |
MMBtu
|
$2.54 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $56,893 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $51,780 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $13,078 | $23,140 | - |
$13,078
-
MMBtu
|
- | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,020 | $3,000 |
$3,020
69,754
kWh
|
- | - | |
| 03 | 2.4224: Upgrade controls on compressors | $4,172 | $2,500 |
$4,172
96,131
kWh
|
- | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $941 | $1,315 |
$941
21,688
kWh
|
- | - | |
| 05 | 2.2136: Install / repair insulation on steam lines | $3,357 | $1,535 | - |
$3,357
-
MMBtu
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,526 | $19,716 |
$6,526
182,298
kWh
|
- | - | |
| 07 | 3.3133: Use other waste concentration methods | $25,799 | $50,000 | - | - |
$25,799
-
lb
|
|
| TOTAL RECOMMENDED | $56,893 | $101,206 |
$14,659
369,871
kWh
|
$16,435
-
MMBtu
|
$25,799
-
lb
|
||
| TOTAL IMPLEMENTED | $51,780 | $97,391 |
$9,546
252,052
kWh
|
$16,435
-
MMBtu
|
$25,799
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs