ITAC Assessment: OK0459
ITAC logo
ITAC Assessment: OK0459
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Bottle labels and trading stamps
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 90,000
ft2
Annual Production 240,000
thousand feet
Production Hrs. Annual 6,120
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,003 3,015,827
kWh
Natural Gas $284,626 95,005
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,522 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,522

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7111: Reduce illumination to minimum necessary levels $310 $105 $310
6,155
kWh
02 2.4221: Install compressor air intakes in coolest locations $774 $795 $774
15,533
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,445 $4,049 $1,445
24,033
kWh
04 2.7135: Install occupancy sensors $3,993 $3,564 $3,993
79,719
kWh
TOTAL RECOMMENDED $6,522 $8,513 $6,522
125,440
kWh
TOTAL IMPLEMENTED $6,522 $8,513 $6,522
125,440
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs