ITAC Assessment: OK0456
ITAC logo
ITAC Assessment: OK0456
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product HVAC fan coils
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 200,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $218,432 4,238,570
kWh
Natural Gas $68,927 22,372
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,159 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,064

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6231: Utilize controls to operate equipment only when needed $5,279 $960 - $5,279
-
MMBtu
02 2.2437: Recover waste heat from equipment $2,924 $2,916 - $2,924
-
MMBtu
03 2.2511: Insulate bare equipment $598 $2,277 - $598
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $573 - $573
14,068
kWh
-
05 2.6232: Install set-back timers $8,254 $196 - $8,254
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $21,531 $27,426 $21,531
365,182
kWh
-
TOTAL RECOMMENDED $39,159 $33,775 $22,104
379,250
kWh
$17,055
-
MMBtu
TOTAL IMPLEMENTED $35,064 $28,582 $21,531
365,182
kWh
$13,533
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs