ITAC Assessment: OK0450
ITAC logo
ITAC Assessment: OK0450
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Fabric covers
NAICS
n/a
SIC 2394: Canvas and Related Products
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 110,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 7,280
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,371 1,775,791
kWh
Natural Gas $11,668 2,384
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,952 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,091

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,087 $6,264 $2,087
31,067
kWh
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,150 $6,790 $2,943
48,945
kWh
$(-793.0)
-
MMBtu
03 2.7241: Install outside air damper / economizer on hvac unit $1,624 $4,901 $1,624
64,478
kWh
-
04 2.7131: Add area lighting switches $861 $1,272 $861
33,998
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $513 $997 $513
3,810
kWh
-
06 2.2437: Recover waste heat from equipment $419 $544 - $419
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $298 $655 $298
6,155
kWh
-
TOTAL RECOMMENDED $7,952 $21,423 $8,326
188,453
kWh
$(-374.0)
-
MMBtu
TOTAL IMPLEMENTED $2,091 $3,468 $1,672
43,963
kWh
$419
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs