ITAC Assessment: OK0440
ITAC logo
ITAC Assessment: OK0440
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Meat processing-Ham and bacon
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 750,000
ft2
Annual Production 26,000,000
lb
Production Hrs. Annual 6,624
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $978,434 17,428,488
kWh
Natural Gas $242,625 70,272
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,200 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,200

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $22,747 $25,415 $22,747
290,152
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $14,382 - $14,382
235,053
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,930 $16,704 $9,930
221,571
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,522 $5,878 $4,522
83,529
kWh
05 2.4221: Install compressor air intakes in coolest locations $1,037 $700 $1,037
10,551
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $368 - $368
17,585
kWh
07 2.2511: Insulate bare equipment $214 $258 $214
8,792
kWh
TOTAL RECOMMENDED $53,200 $48,955 $53,200
867,233
kWh
TOTAL IMPLEMENTED $53,200 $48,955 $53,200
867,233
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs