| Assessment Year | 1994 |
|---|---|
| Principal Product | Truck Bodies, pipe beveling tools and wireline equipment |
| NAICS |
n/a
|
| SIC | 3713: Truck and Bus Bodies |
| Sales Range | $5 M to 10M |
| # of Employees | 75 |
| Plant Area |
160,000
ft2
|
| Annual Production | 800
pieces
|
| Production Hrs. Annual | 3,900
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $53,270 | 973,329 |
kWh
|
$0.055 |
| Natural Gas | $20,276 | 5,847 |
MMBtu
|
$3.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $5,489 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,813 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,558 | $3,224 |
$1,558
16,999
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,281 | $3,318 |
$1,281
18,757
kWh
|
- | - | |
| 03 | 2.7224: Reduce space conditioning during non-working hours | $999 | $900 | - |
$999
-
MMBtu
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $315 | - |
$315
6,155
kWh
|
- | - | |
| 05 | 2.2437: Recover waste heat from equipment | $572 | $741 | - | - |
$572
-
MMBtu
|
|
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $358 | - | - | - |
$358
-
MMBtu
|
|
| 07 | 2.6212: Turn off equipment during breaks, reduce operating time | $178 | - |
$178
5,275
kWh
|
- | - | |
| 08 | 2.7134: Use photocell controls | $124 | $200 |
$124
3,810
kWh
|
- | - | |
| 09 | 2.4221: Install compressor air intakes in coolest locations | $104 | $317 | - | - |
$104
-
MMBtu
|
|
| TOTAL RECOMMENDED | $5,489 | $8,700 |
$3,456
50,996
kWh
|
$999
-
MMBtu
|
$1,034
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $4,813 | $7,642 |
$3,456
50,996
kWh
|
$999
-
MMBtu
|
$358
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs