ITAC Assessment: OK0426
ITAC logo
ITAC Assessment: OK0426
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Truck Bodies, pipe beveling tools and wireline equipment
NAICS
n/a
SIC 3713: Truck and Bus Bodies
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 160,000
ft2
Annual Production 800
pieces
Production Hrs. Annual 3,900
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,270 973,329
kWh
Natural Gas $20,276 5,847
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,489 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,813

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,558 $3,224 $1,558
16,999
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,281 $3,318 $1,281
18,757
kWh
- -
03 2.7224: Reduce space conditioning during non-working hours $999 $900 - $999
-
MMBtu
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $315 - $315
6,155
kWh
- -
05 2.2437: Recover waste heat from equipment $572 $741 - - $572
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $358 - - - $358
-
MMBtu
07 2.6212: Turn off equipment during breaks, reduce operating time $178 - $178
5,275
kWh
- -
08 2.7134: Use photocell controls $124 $200 $124
3,810
kWh
- -
09 2.4221: Install compressor air intakes in coolest locations $104 $317 - - $104
-
MMBtu
TOTAL RECOMMENDED $5,489 $8,700 $3,456
50,996
kWh
$999
-
MMBtu
$1,034
-
MMBtu
TOTAL IMPLEMENTED $4,813 $7,642 $3,456
50,996
kWh
$999
-
MMBtu
$358
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs