ITAC Assessment: UA0001
ITAC logo
ITAC Assessment: UA0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Custom Wooden Cabinets
NAICS 321918: Other Millwork (including Flooring)
SIC 2431: Millwork
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 48,000
ft2
Annual Production 150
units
Production Hrs. Annual 3,116
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,979 408,960
kWh
Electricity Demand $9,949 2,099
kW-mo/yr
Natural Gas $11,157 649
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,464 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,286 $252 $1,286
14,675
kWh
- - - - -
02 2.2437: Recover waste heat from equipment $1,116 $3,113 - - $1,116
-
MMBtu
- - -
03 2.7111: Reduce illumination to minimum necessary levels $1,151 $64 $942
11,192
kWh
$209
-
kW-mo/yr
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,147 $3,013 $3,398
40,348
kWh
$749
-
kW-mo/yr
- - - -
05 4.712: Utilize job costing software $31,200 $8,489 - - - - - $31,200
06 3.4151: Minimize water usage $564 $1,110 - - - $564
-
Tgal
- -
07 3.5311: Recover and reuse waste material $6,000 - - - - - $6,000
-
lb
-
TOTAL RECOMMENDED $45,464 $16,041 $5,626
66,215
kWh
$958
-
kW-mo/yr
$1,116
-
MMBtu
$564
-
Tgal
$6,000
-
lb
$31,200
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs