ITAC Assessment: MI0180
ITAC logo
ITAC Assessment: MI0180
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Paint Pigments
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2816: Inorganic Pigments
Sales Range $5
M
to 10
M
# of Employees 37
Plant Area 95,000
ft2
Annual Production 250
Tgal
Production Hrs. Annual 4,080
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $365,340 1,809,060
kWh
Electricity Demand $36,941 4,506
kW-mo/yr
Electricity Fees $2,400 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $130,316 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $119,083

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6218: Turn off equipment when not in use $62,188 $3,320 $52,183
414,852
kWh
$10,005
-
kW-mo/yr
02 2.7221: Lower temperature during the winter season and vice-versa $51,365 $2,000 $45,885
227,208
kWh
$5,480
-
kW-mo/yr
03 2.7496: Install partitions to reduce size of conditioned space $7,931 $10,320 $7,085
35,083
kWh
$846
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,220 $1,210 $4,791
23,724
kWh
$429
-
kW-mo/yr
05 2.4323: Use optimum size and capacity equipment $3,302 $4,531 $2,572
12,736
kWh
$730
-
kW-mo/yr
06 2.4231: Reduce the pressure of compressed air to the minimum required $310 $40 $234
1,158
kWh
$76
-
kW-mo/yr
TOTAL RECOMMENDED $130,316 $21,421 $112,750
714,761
kWh
$17,566
-
kW-mo/yr
TOTAL IMPLEMENTED $119,083 $6,570 $103,093
666,942
kWh
$15,990
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs