ITAC Assessment: SF0479
ITAC logo
ITAC Assessment: SF0479
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Fiber reinforced polymer composites
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 18,000
ft2
Annual Production 6,000,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,497 161,934
kWh
Electricity Demand $17,361 1,372
kW-mo/yr
Natural Gas $4,861 447
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,327 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,268

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $796 $70 $550
3,791
kWh
$246
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,025 $210 $1,025
7,061
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,397 $4,166 $1,230
8,478
kWh
$17
-
kW-mo/yr
$129 $21
04 2.7135: Install occupancy sensors $846 $2,490 $431
2,972
kWh
$415
-
kW-mo/yr
- -
05 2.9114: Use solar heat to make electricty $24,263 $204,396 $19,229
132,865
kWh
$5,034
-
kW-mo/yr
- -
TOTAL RECOMMENDED $28,327 $211,332 $22,465
155,167
kWh
$5,712
-
kW-mo/yr
$129 $21
TOTAL IMPLEMENTED $3,268 $6,866 $2,686
18,511
kWh
$432
-
kW-mo/yr
$129 $21
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs