ITAC Assessment: OK0417
ITAC logo
ITAC Assessment: OK0417
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Residential Pressurized Water Tanks
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 126,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,397 2,866,940
kWh
Natural Gas $98,515 24,169
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,720 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,336

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,331 $180 $5,331
157,386
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,551 - $3,551
70,047
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,614 $5,045 $1,614
28,136
kWh
-
04 2.6232: Install set-back timers $1,428 $1,200 - $1,428
-
MMBtu
05 2.4239: Eliminate or reduce compressed air usage $922 $790 $922
16,120
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $833 $2,567 $833
9,379
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $827 $946 $827
12,603
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $767 - $767
14,068
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $447 - $447
8,792
kWh
-
TOTAL RECOMMENDED $15,720 $10,728 $14,292
316,531
kWh
$1,428
-
MMBtu
TOTAL IMPLEMENTED $11,336 $8,161 $9,908
237,105
kWh
$1,428
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs