Assessment Year | 1993 |
---|---|
Principal Product | Heat Recovery Steam Generators |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $50 M to 100M |
# of Employees | 205 |
Plant Area |
143,500
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,630
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $153,044 | 2,589,390 |
kWh
|
$0.059 |
Natural Gas | $89,712 | 30,071 |
MMBtu
|
$2.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,152 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,759 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $23,207 | $118,871 | - |
$23,207
-
MMBtu
|
|
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,004 | - |
$4,004
79,426
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,186 | $360 |
$2,186
26,964
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,059 | - |
$2,059
64,185
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $971 | $903 |
$971
13,189
kWh
|
- | |
06 | 2.6232: Install set-back timers | $725 | $750 | - |
$725
-
MMBtu
|
|
TOTAL RECOMMENDED | $33,152 | $120,884 |
$9,220
183,764
kWh
|
$23,932
-
MMBtu
|
||
TOTAL IMPLEMENTED | $7,759 | $1,653 |
$7,034
156,800
kWh
|
$725
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs