ITAC Assessment: OK0407
ITAC logo
ITAC Assessment: OK0407
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Heat Recovery Steam Generators
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $50
M
to 100
M
# of Employees 205
Plant Area 143,500
ft2
Annual Production 0
units
Production Hrs. Annual 6,630
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,044 2,589,390
kWh
Natural Gas $89,712 30,071
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,152 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,759

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $23,207 $118,871 - $23,207
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,004 - $4,004
79,426
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,186 $360 $2,186
26,964
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,059 - $2,059
64,185
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $971 $903 $971
13,189
kWh
-
06 2.6232: Install set-back timers $725 $750 - $725
-
MMBtu
TOTAL RECOMMENDED $33,152 $120,884 $9,220
183,764
kWh
$23,932
-
MMBtu
TOTAL IMPLEMENTED $7,759 $1,653 $7,034
156,800
kWh
$725
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs