ITAC Assessment: OK0403
ITAC logo
ITAC Assessment: OK0403
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Daily Newspapers
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $5
M
to 10
M
# of Employees 172
Plant Area 300,000
ft2
Annual Production 502,240
pieces
Production Hrs. Annual 6,188
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,728 1,927,022
kWh
Natural Gas $2,423 441
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,561 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,490

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $17,738 $27,600 $17,738
436,694
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,114 $520 $1,114
15,826
kWh
03 2.7135: Install occupancy sensors $537 $392 $537
17,292
kWh
04 2.6218: Turn off equipment when not in use $2,927 - $2,927
94,373
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $101 - $101
1,758
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $176 - $176
6,741
kWh
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $549 - $549
8,206
kWh
08 2.6232: Install set-back timers $419 $80 $419
13,482
kWh
TOTAL RECOMMENDED $23,561 $28,592 $23,561
594,372
kWh
TOTAL IMPLEMENTED $19,490 $28,512 $19,490
471,570
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs