ITAC Assessment: OK0400
ITAC logo
ITAC Assessment: OK0400
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Ar Conditioning Units
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 163
Plant Area 180,000
ft2
Annual Production 7,000
pieces
Production Hrs. Annual 4,335
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,667 2,416,471
kWh
Natural Gas $22,865 7,303
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,729 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,003

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6232: Install set-back timers $10,933 $1,316 - $10,933
-
MMBtu
02 2.4239: Eliminate or reduce compressed air usage $3,801 $2,000 $3,801
128,077
kWh
-
03 2.2437: Recover waste heat from equipment $925 $192 - $925
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $653 - $653
30,481
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $229 - $229
7,034
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $188 $258 $188
5,862
kWh
-
TOTAL RECOMMENDED $16,729 $3,766 $4,871
171,454
kWh
$11,858
-
MMBtu
TOTAL IMPLEMENTED $12,003 $1,574 $1,070
43,377
kWh
$10,933
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs