ITAC Assessment: OK0395
ITAC logo
ITAC Assessment: OK0395
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Agricultural Tillage Tools
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 99
Plant Area 157,000
ft2
Annual Production 8,800,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,155 2,491,794
kWh
Natural Gas $211,066 89,808
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,779 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,721

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,066 $1,500 $8,066
172,333
kWh
-
02 2.6232: Install set-back timers $4,476 $1,548 - $4,476
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,521 $5,087 $1,521
23,740
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,655 - $1,655
29,308
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,061 - $1,061
18,757
kWh
-
TOTAL RECOMMENDED $16,779 $8,135 $12,303
244,138
kWh
$4,476
-
MMBtu
TOTAL IMPLEMENTED $9,721 $1,500 $9,721
201,641
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs