| Assessment Year | 1995 |
|---|---|
| Principal Product | Metal Stampings |
| NAICS |
n/a
|
| SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
| Sales Range | $5 M to 10M |
| # of Employees | 50 |
| Plant Area |
78,000
ft2
|
| Annual Production | 100,000,000
pieces
|
| Production Hrs. Annual | 2,626
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $146,252 | 863,130 |
kWh
|
$0.17 |
| Natural Gas | $51,439 | 5,595 |
MMBtu
|
$9.19 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $18,284 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,693 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $810 | $1,088 |
$810
4,982
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $411 | $713 |
$411
2,638
kWh
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $358 | $1,006 |
$358
2,052
kWh
|
- | |
| 04 | 2.7124: Make a practice of turning off lights when not needed | $2,177 | - |
$2,177
9,672
kWh
|
- | |
| 05 | 2.2136: Install / repair insulation on steam lines | $242 | $126 | - |
$242
-
MMBtu
|
|
| 06 | 2.1232: Keep boiler tubes clean | $1,072 | $1,000 | - |
$1,072
-
MMBtu
|
|
| 07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $7,991 | $3,000 |
$10,462
63,013
kWh
|
$(-2,471.0)
-
MMBtu
|
|
| 08 | 2.2514: Cover open tanks | $5,223 | $212 |
$5,223
31,653
kWh
|
- | |
| TOTAL RECOMMENDED | $18,284 | $7,145 |
$19,441
114,010
kWh
|
$(-1,157.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $9,693 | $3,013 |
$8,621
48,945
kWh
|
$1,072
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs