ITAC Assessment: HO0106
ITAC logo
ITAC Assessment: HO0106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Metal Stampings
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 78,000
ft2
Annual Production 100,000,000
pieces
Production Hrs. Annual 2,626
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,252 863,130
kWh
Natural Gas $51,439 5,595
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,284 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,693

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $810 $1,088 $810
4,982
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $411 $713 $411
2,638
kWh
-
03 2.4133: Use most efficient type of electric motors $358 $1,006 $358
2,052
kWh
-
04 2.7124: Make a practice of turning off lights when not needed $2,177 - $2,177
9,672
kWh
-
05 2.2136: Install / repair insulation on steam lines $242 $126 - $242
-
MMBtu
06 2.1232: Keep boiler tubes clean $1,072 $1,000 - $1,072
-
MMBtu
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,991 $3,000 $10,462
63,013
kWh
$(-2,471.0)
-
MMBtu
08 2.2514: Cover open tanks $5,223 $212 $5,223
31,653
kWh
-
TOTAL RECOMMENDED $18,284 $7,145 $19,441
114,010
kWh
$(-1,157.0)
-
MMBtu
TOTAL IMPLEMENTED $9,693 $3,013 $8,621
48,945
kWh
$1,072
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs