ITAC Assessment: OK0394
ITAC logo
ITAC Assessment: OK0394
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Livestock and Poultry Feeds
NAICS
n/a
SIC 2875: Fertilizers, Mixing Only
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 93,500
ft2
Annual Production 120,000
ton
Production Hrs. Annual 7,476
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $232,458 4,892,145
kWh
Natural Gas $54,292 18,466
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,395 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,768

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,467 $6,944 $2,467
22,274
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,326 $6,750 $6,326
87,632
kWh
-
03 2.1241: Reduce excessive boiler blowdown $865 $1,270 - $865
-
MMBtu
04 2.2122: Install / repair insulation on condensate lines $110 $296 - $110
-
MMBtu
05 2.6232: Install set-back timers $627 $404 - $627
-
MMBtu
TOTAL RECOMMENDED $10,395 $15,664 $8,793
109,906
kWh
$1,602
-
MMBtu
TOTAL IMPLEMENTED $9,768 $15,260 $8,793
109,906
kWh
$975
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs