ITAC Assessment: OR0399
ITAC logo
ITAC Assessment: OR0399
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Kiln-Dryed Lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area
n/a
Annual Production 23,000
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $286,014 5,969,480
kWh
Electricity Demand $8,607 18,180
kW-mo/yr
Electricity Fees $11,462 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,785 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,410

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $11,030 $9,500 - - $11,030
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $22,410 $98,120 $22,410
700,334
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,926 $4,000 $2,798
87,423
kWh
$1,128
-
kW-mo/yr
-
04 2.4323: Use optimum size and capacity equipment $4,029 $18,400 $2,838
88,695
kWh
$1,191
-
kW-mo/yr
-
05 2.4322: Use or replace with energy efficient substitutes $1,390 $6,063 $687
21,454
kWh
$703
-
kW-mo/yr
-
TOTAL RECOMMENDED $42,785 $136,083 $28,733
897,906
kWh
$3,022
-
kW-mo/yr
$11,030
TOTAL IMPLEMENTED $22,410 $98,120 $22,410
700,334
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs