ITAC Assessment: OK0390
ITAC logo
ITAC Assessment: OK0390
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product OIL SEALS, BALL JOINTS,CHASIS PRODUCTS
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 135,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,344
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $312,415 5,807,444
kWh
Natural Gas $38,280 10,525
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,208 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,165

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $10,672 - $10,672
302,462
kWh
- -
02 2.3191: Use demand controller or load shedder $703 $8,556 $703
-
kWh
- -
03 2.8114: Change rate schedules or other changes in utility service $1,340 - - $1,340
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $733 $447 $1,007
20,516
kWh
- $(-274.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $88 $964 $211
2,931
kWh
- $(-123.0)
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $370 $772 $370
7,620
kWh
- -
07 2.6232: Install set-back timers $302 $302 $302
8,499
kWh
- -
TOTAL RECOMMENDED $14,208 $11,041 $13,265
342,028
kWh
$1,340
-
MMBtu
$(-397.0)
TOTAL IMPLEMENTED $12,165 $2,485 $12,562
342,028
kWh
- $(-397.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs