| Assessment Year | 1992 |
|---|---|
| Principal Product | STRUCTURAL STEEL |
| NAICS |
n/a
|
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $10 M to 50M |
| # of Employees | 90 |
| Plant Area |
n/a
|
| Annual Production | 65,000
ton
|
| Production Hrs. Annual | 6,864
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $65,834 | 966,589 |
kWh
|
$0.068 |
| Natural Gas | $18,812 | 3,862 |
MMBtu
|
$4.87 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $8,246 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,724 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,084 | $200 |
$2,284
64,771
kWh
|
- | $(-200.0) | |
| 02 | 2.7123: Keep lamps and reflectors clean | $2,686 | $6,210 |
$2,723
39,566
kWh
|
$(-280.0)
-
MMBtu
|
$243 | |
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $1,437 | $1,350 |
$1,437
28,722
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $941 | $1,348 |
$576
8,499
kWh
|
- | $365 | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $262 | $1,385 |
$469
3,810
kWh
|
$(-27.0)
-
MMBtu
|
$(-180.0) | |
| 06 | 2.7261: Install timers and/or thermostats | $371 | $203 | - |
$371
-
MMBtu
|
- | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $201 | $683 |
$201
5,569
kWh
|
- | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $264 | $147 |
$264
2,345
kWh
|
- | - | |
| TOTAL RECOMMENDED | $8,246 | $11,526 |
$7,954
153,282
kWh
|
$64
-
MMBtu
|
$228 | ||
| TOTAL IMPLEMENTED | $4,724 | $4,283 |
$4,766
105,802
kWh
|
$(-27.0)
-
MMBtu
|
$(-15.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs