ITAC Assessment: OK0388
ITAC logo
ITAC Assessment: OK0388
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product FLIGHT SIMULATORS
NAICS
n/a
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $50
M
to 100
M
# of Employees 480
Plant Area
n/a
Annual Production 16
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $259,682 5,821,512
kWh
Natural Gas $7,043 1,559
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,979 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,266

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,461 $1,798 $4,111
70,047
kWh
$(-650.0)
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,508 $11,034 $5,508
142,732
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $482 $1,424 $620
13,775
kWh
$(-138.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $231 - $231
3,517
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $297 - $297
7,034
kWh
-
TOTAL RECOMMENDED $9,979 $14,256 $10,767
237,105
kWh
$(-788.0)
TOTAL IMPLEMENTED $9,266 $12,832 $9,916
219,813
kWh
$(-650.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs