Assessment Year | 1984 |
---|---|
Principal Product | TISSUE PRODUCTS |
NAICS |
n/a
|
SIC | 2621: Paper Mills |
Sales Range | $5 M to 10M |
# of Employees | 150 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 8,640
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $805,251 | 26,776,964 |
kWh
|
$0.030 |
Natural Gas | $424,963 | 124,003 |
MMBtu
|
$3.43 |
Other Energy | $1,877,784 | 356,456 |
MMBtu
|
$5.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $209,604 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,760 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $12,995 | $27,645 |
$12,995
-
kWh
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,226 | $18,444 |
$5,521
179,660
kWh
|
- | - | $(-295.0) | |
03 | 2.3212: Optimize plant power factor | $1,583 | $4,500 |
$1,583
24,033
kWh
|
- | - | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $163,286 | $127,500 | - |
$163,286
-
MMBtu
|
- | - | |
05 | 2.2511: Insulate bare equipment | $25,975 | $12,618 | - |
$14,236
-
MMBtu
|
$11,739
-
MMBtu
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $404 | $79 |
$404
13,189
kWh
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $135 | $185 |
$135
2,345
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $209,604 | $190,971 |
$20,638
219,227
kWh
|
$177,522
-
MMBtu
|
$11,739
-
MMBtu
|
$(-295.0) | ||
TOTAL IMPLEMENTED | $18,760 | $46,353 |
$19,055
195,194
kWh
|
- | - | $(-295.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs