| Assessment Year | 1992 |
|---|---|
| Principal Product | OIL SEALS |
| NAICS |
n/a
|
| SIC | 3053: Gaskets, Packing, and Sealing Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 290 |
| Plant Area |
n/a
|
| Annual Production | 37,000,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $608,650 | 14,769,930 |
kWh
|
$0.041 |
| Natural Gas | $417 | 91 |
MMBtu
|
$4.58 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $172,016 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,621 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,774 | - |
$2,864
102,286
kWh
|
- | $(-90.0) | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $1,854 | $574 |
$1,854
66,237
kWh
|
- | - | |
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $148,079 | $77,986 |
$259,858
7,483,587
kWh
|
$(-111,779.0)
-
MMBtu
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $4,046 | $7,844 |
$612
21,981
kWh
|
$3,434
-
MMBtu
|
- | |
| 05 | 2.7263: Lower compressor pressure through a/c system modification | $3,416 | $9,000 |
$3,416
121,923
kWh
|
- | - | |
| 06 | 2.7226: Use computer programs to optimize hvac performance | $11,847 | $16,034 |
$11,847
423,212
kWh
|
- | - | |
| TOTAL RECOMMENDED | $172,016 | $111,438 |
$280,451
8,219,226
kWh
|
$(-108,345.0)
-
MMBtu
|
$(-90.0) | ||
| TOTAL IMPLEMENTED | $14,621 | $16,034 |
$14,711
525,498
kWh
|
- | $(-90.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs