ITAC Assessment: OK0382
ITAC logo
ITAC Assessment: OK0382
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product MUSHROOMS-CANNED & FRESH
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 370
Plant Area
n/a
Annual Production 15,000,000
lb
Production Hrs. Annual 3,276
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $281,978 7,061,548
kWh
Natural Gas $375,476 150,666
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,113 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,406

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $345 $6,362 $1,458
33,118
kWh
- $(-1,113.0)
02 2.7261: Install timers and/or thermostats $909 $606 - $909
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $4,333 $2,790 - $4,333
-
MMBtu
-
04 2.2441: Preheat boiler makeup water with waste process heat $12,447 $29,926 $2,823
97,890
kWh
$9,624
-
MMBtu
-
05 2.7263: Lower compressor pressure through a/c system modification $20,707 $66,000 $20,707
941,383
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $372 $2,263 $372
8,499
kWh
- -
TOTAL RECOMMENDED $39,113 $107,947 $25,360
1,080,890
kWh
$14,866
-
MMBtu
$(-1,113.0)
TOTAL IMPLEMENTED $18,406 $41,947 $4,653
139,507
kWh
$14,866
-
MMBtu
$(-1,113.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs