| Assessment Year | 1992 |
|---|---|
| Principal Product | MUSHROOMS-CANNED & FRESH |
| NAICS |
n/a
|
| SIC | 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies |
| Sales Range | $10 M to 50M |
| # of Employees | 370 |
| Plant Area |
n/a
|
| Annual Production | 15,000,000
lb
|
| Production Hrs. Annual | 3,276
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $281,978 | 7,061,548 |
kWh
|
$0.040 |
| Natural Gas | $375,476 | 150,666 |
MMBtu
|
$2.49 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $39,113 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $18,406 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $345 | $6,362 |
$1,458
33,118
kWh
|
- | $(-1,113.0) | |
| 02 | 2.7261: Install timers and/or thermostats | $909 | $606 | - |
$909
-
MMBtu
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,333 | $2,790 | - |
$4,333
-
MMBtu
|
- | |
| 04 | 2.2441: Preheat boiler makeup water with waste process heat | $12,447 | $29,926 |
$2,823
97,890
kWh
|
$9,624
-
MMBtu
|
- | |
| 05 | 2.7263: Lower compressor pressure through a/c system modification | $20,707 | $66,000 |
$20,707
941,383
kWh
|
- | - | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $372 | $2,263 |
$372
8,499
kWh
|
- | - | |
| TOTAL RECOMMENDED | $39,113 | $107,947 |
$25,360
1,080,890
kWh
|
$14,866
-
MMBtu
|
$(-1,113.0) | ||
| TOTAL IMPLEMENTED | $18,406 | $41,947 |
$4,653
139,507
kWh
|
$14,866
-
MMBtu
|
$(-1,113.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs