ITAC Assessment: NC0423
ITAC logo
ITAC Assessment: NC0423
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product PVC mouldings
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 450
Plant Area 500,000
ft2
Annual Production 90,500,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,529,622 34,404,450
kWh
Electricity Demand $620,986 62,223
kW-mo/yr
Electricity Fees $252,845 -
Natural Gas $383,090 70,676
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,655,037 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,512,924

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings Primary Product Savings
01 4.113: Install refrigeration system to cool product $1,468,749 $650,000 $105,844
2,380,664
kWh
$22,515
-
kW-mo/yr
- - - $(-29,610.0)
-
Tgal
$1,370,000
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,736 $100 $5,726
128,800
kWh
$1,850
-
kW-mo/yr
- $(-600.0) $(-240.0) - -
03 2.4239: Eliminate or reduce compressed air usage $26,211 $60,000 $21,437
482,160
kWh
$6,874
-
kW-mo/yr
- - - $(-2,100.0)
-
Tgal
-
04 2.2437: Recover waste heat from equipment $24,869 $42,000 - - $24,869
-
MMBtu
- - - -
05 2.7447: Install vinyl strip / high speed / air curtain doors $86,720 $87,892 - - $86,720
-
MMBtu
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $34,209 $115,608 $30,013
675,058
kWh
$9,625
-
kW-mo/yr
- - $(-5,429.0) - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,230 $4,585 $2,441
54,906
kWh
$789
-
kW-mo/yr
- - - - -
08 2.7135: Install occupancy sensors $4,313 $12,378 $4,313
97,015
kWh
- - - - - -
TOTAL RECOMMENDED $1,655,037 $972,563 $169,774
3,818,603
kWh
$41,653
-
kW-mo/yr
$111,589
-
MMBtu
$(-600.0) $(-5,669.0) $(-31,710.0)
-
Tgal
$1,370,000
TOTAL IMPLEMENTED $1,512,924 $770,293 $144,024
3,239,428
kWh
$34,779
-
kW-mo/yr
- $(-600.0) $(-5,669.0) $(-29,610.0)
-
Tgal
$1,370,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs