ITAC Assessment: OK0381
ITAC logo
ITAC Assessment: OK0381
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product HEAT EXCHANGERS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 715
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,430 3,633,353
kWh
Natural Gas $46,201 16,761
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,198 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,321

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $6,587 $150 $6,737
217,468
kWh
- $(-150.0)
02 2.2511: Insulate bare equipment $374 $1,389 - $374
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $11,360 $1,185 - $11,360
-
MMBtu
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,183 $26,505 $13,183
340,563
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,694 - $2,694
69,754
kWh
- -
TOTAL RECOMMENDED $34,198 $29,229 $22,614
627,785
kWh
$11,734
-
MMBtu
$(-150.0)
TOTAL IMPLEMENTED $18,321 $2,724 $6,737
217,468
kWh
$11,734
-
MMBtu
$(-150.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs