ITAC Assessment: OK0371
ITAC logo
ITAC Assessment: OK0371
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product CONFECTIONERY
NAICS
n/a
SIC 2064: Candy and Other Confectionery Products
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 30,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $288,863 5,270,223
kWh
Natural Gas $114,375 41,171
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,674 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,286

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $5,816 - - $5,816
-
MMBtu
-
02 2.2123: Insulate feedwater tank $253 $150 - $253
-
MMBtu
-
03 2.2122: Install / repair insulation on condensate lines $267 $69 - $267
-
MMBtu
-
04 2.2136: Install / repair insulation on steam lines $220 $185 - $220
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,767 $2,434 $2,361
43,083
kWh
- $(-594.0)
06 2.4221: Install compressor air intakes in coolest locations $730 $138 $730
16,706
kWh
- -
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $17,621 $23,222 $18,173
242,087
kWh
$(-1,235.0)
-
MMBtu
$683
TOTAL RECOMMENDED $26,674 $26,198 $21,264
301,876
kWh
$5,321
-
MMBtu
$89
TOTAL IMPLEMENTED $7,286 $542 $730
16,706
kWh
$6,556
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs